02 — Our work

Your projectstake shape.

Bathrooms, kitchens and insulation, photographed on our job sites: before, during and after the work.

Project photos
47
Projects delivered
20+
Since
2021
Double wood vanity and marble-look tile
Bathroom · Finished
Floating vanity and round backlit mirror
Bathroom · Finished
Kitchen island with gold hardware, during finishing
Kitchen · In progress

01 — Our method, in photos

From job siteto finish.

What happens behind the walls matters as much as the result. Each step is checked before moving on to the next.

Demolition

We strip the room back to the structure. Plumbing, studs and subfloor are exposed, so we know what we are building on.

Bathroom stripped back to the structure
Bathroom stripped back to the structure
Demolition down to the studs
Demolition down to the studs

02 — During · After

Slide tosee the difference.

On the left, tile being set with levelling clips. On the right, the finished bathroom: aligned grout lines, glass panel installed.

Tub-shower · Marble-look tile

After — Tub with glass panel and marble-look tileDuring — Walls tiled around the tub with levelling clipsDuringAfter

03 — Gallery

All ourphotos.

47 photos

RBQ 5852-9470-01 ↗Written warranty · 1 year$2,000,000 civil liability insurance with Lloyd’sSince 2021

11 — Quote

Let’s talk about your
project.

What happens next

  1. 01You describe your project here.
  2. 02We call you back within 2 business days.
  3. 03We visit, measure, and you receive a written quote.

Would you rather talk?

(514) 638-9215
Step 01 / 02Your project
What is your project?
City
Choose a project and a city

Response within 2 business days. Your information stays with MKCLM. Privacy

CallQuote